Pressurised degassing system

for the treatment of boiler feed water.

Technical Aspects

  • 3m³ Carbon steel main holding vessel
  • DN400 stainless steel mixing unit with cascade trays and steam sparge
  • Carbon steel skid frame & pipework support
  • Design temperature over whole system 0°c to 210°c
  • Design pressure over whole system 1.2 to 18 bar(g) 

Build completion within 3 weeks