Pressurised degassing system
for the treatment of boiler feed water.
Technical Aspects
- 3m³ Carbon steel main holding vessel
- DN400 stainless steel mixing unit with cascade trays and steam sparge
- Carbon steel skid frame & pipework support
- Design temperature over whole system 0°c to 210°c
- Design pressure over whole system 1.2 to 18 bar(g)
Build completion within 3 weeks